Opoka · Krawczyk
ADWOKACI

Contract for a specific work (umowa o dzieło) between businesses: result, acceptance and defects

A contract for a specific work (umowa o dzieło) with another business concerns the delivery of a defined result and works well where both parties can describe and check that result. A customer company may, for example, need a jig of specific dimensions for its production station. Before signing the document, it is worth establishing how the two businesses will know that the jig matches the order, and what they will do if a discrepancy appears during the work.

Opoka · KrawczykLegal position stated in the Polish source:

A defined result as against continuing performance of activities

In assessing the type of contract, what matters are the obligations described in the order and the way the cooperation is carried out. A business that is to deliver one jig matching the documentation takes on a different task from a business that provides operation of a station for a set period. In the first case, the characteristics of the item to be made can be described. In the second, what may matter above all is the way the activities are performed from day to day.

One document may cover both tasks. It is then good to describe separately the making of the jig, its handover and the later operation. This makes it possible to establish what is subject to acceptance after performance and which part of the remuneration relates to what. Neither the name of the contract nor the acceptance criteria alone decide how all the performances in such a document are classified. A broader discussion of the different models is in the guide B2B cooperation agreement: what it should contain and which provisions govern it .

A description of the work that can be used on acceptance

The description of the result is best prepared from the angle of its use. If the jig is to fit a particular station, the identification of the machine, the agreed dimensions and the version of the drawing will be useful. If the parties envisage a functional test, they should state under what conditions it will be carried out and which characteristics will be checked then.

An order covering a graphic file for printing is described differently. Here the file format, the size of the design, the language variants and the way the final version is delivered may matter. Illustrative material on the basis of which the direction of the work was agreed must be distinguished from the accepted specification. This makes it possible to establish which characteristics the parties actually agreed before the quotation.

The description should match what can be checked on site. If some properties can be assessed only after the machine is connected, it is worth providing for who will prepare the station and make the necessary parts available. It is also good to note from whom the contractor will receive the input data. In this way both parties know what material is to be the basis of the work and of the test.

Acceptance of the work and settlement of the remuneration

Before the work begins, it is good to agree how the contractor will report that the work is ready, who will check the result and when they may do so. The criteria can be assigned to successive tests or parts of the work. If a business accepts files, labelling the version will be useful. For a movable item, a similar role may be played by the item's serial number or a mark on the handover document.

In the report, it is good to link each comment to a specific requirement. Instead of a general statement about poor quality, one can describe which element does not fit, what parameter was agreed and what result the test gave. This allows the contractor to respond to the same objection that the customer raised. Once the element is corrected, both businesses can refer to the same item of the report.

The remuneration and the payment deadline are best described in connection with the agreed manner of handing over the work. For an order covering several parts, it should be stated which of them will be settled separately. Where the parties dispute a defect, whether the customer must accept the work, what significance the absence of a signature on the report has and when the remuneration falls due all require assessment in the particular case.

If the contractor is to deliver a graphic or another work protected by copyright, it is good to agree in the contract the extent to which the customer will be able to use it. The transfer of copyright has its own requirements, so this matter is worth discussing before signing. Other provisions to check at this stage are indicated in the guide Commercial contract: what to check before signing .

Reacting during the work and defects in the work delivered

If the contractor performs the work defectively or contrary to the contract, the customer may call on it to change the manner of performance and set an appropriate time limit for that. After that time limit has expired without result, the customer may withdraw from the contract or entrust the correction to another person. This manner of reacting concerns irregularities during performance of the work, which are addressed by Article 636 of the Civil Code. The scope of the demand, the length of an appropriate time limit and the settlement of the costs of correction by another person require assessment in the particular case.

Before formulating the demand, the current state of the work should be compared with the accepted drawing or description. It will help to state when the difference was discovered, which stage is still under way and what the expected change is to consist of. If the two businesses had earlier agreed to a different solution, that correspondence must also be taken into account.

Once the work has been delivered, the assessment of reported defects looks different. As regards liability for defects in the work, Article 638 of the Civil Code refers to the accordingly applicable provisions on the statutory warranty in sales. In the analysis, it is good to state both the date of handover and the moment when the given defect came to light. The customer's rights in a particular case depend on the contract and the circumstances, including the fact that the contract was concluded between businesses. Provisions on liability for defects between businesses are discussed in the guide Statutory warranty and guarantee in the sale of goods between businesses .

The contractor's delay before the delivery date

If the delay is so great that completing the work on time becomes improbable, Article 635 of the Civil Code may matter. In such circumstances the customer may withdraw from the contract even before the date for performance. This is a different situation from the defective performance of the work described above. The assessment requires establishing whether and when the contractor began work, what has been done and how much work actually remains.

The agreed final deadline, messages about the progress of the work and information about activities that must follow one another will be useful. A postponement of a single meeting must be distinguished from a delay that undermines the realistic prospect of delivering the whole result. How to prepare the declaration itself is discussed in the guide Termination of a B2B contract or withdrawal: when and how .

From defining the work to checking the result

  1. Defining the resultThe parties define the result and the characteristics that can be checked once the work is finished.
  2. Agreeing acceptanceIt is worth naming the person who carries out the acceptance, the expected time for checking and the assessment criteria.
  3. Non-conformity during the workWhere the work is performed defectively, the customer may call for a change in the manner of performance and set an appropriate time limit.
  4. HandoverThe documents make it possible to set the result delivered and the comments reported against the agreed criteria.

Frequently asked questions

When does a contract for a specific work between businesses suit a single order?

This is easiest to assess once the result and the way of checking it have been described. If the order also covers later operation, it is good to define separately the obligations connected with that part of the cooperation.

How to set the acceptance criteria for a work made to a design?

The date and version of the design should be stated, the required parameters marked and the way of testing agreed. If changes are made, both parties should use the same version of the attachment.

How to report defects in the work that come to light only during use?

In the report, it is good to describe the symptom, the moment it was detected and the conditions in which it can be observed. Data on the acceptance and photographs or test results will be useful, allowing the report to be related to a specific item.

Does the delay of one stage allow withdrawal from the contract?

In an assessment under Article 635 KC, what matters is the likelihood of completing the whole work by the agreed date. The remaining scope of work must be compared with the time left to the final date, and the outcome of that assessment depends on the circumstances of the particular case. Preparing or checking the provisions of a draft is covered by the service Commercial contracts (in Polish).

Related services

Related guides

Do you live abroad?

TwojaSprawa deals with matters concerning Poles living abroad. TwojaSprawa

TwojaSprawa

Have a question about your own case?

Please briefly describe what your matter concerns. We will reply to let you know whether and how we can help. kontakt@polski-prawnik.pl

kontakt@polski-prawnik.pl

Email the firm

Sources

  • Act of 23 April 1964 – Civil Code, Articles 627, 635, 636 and 638.

This material is for information and does not constitute legal advice in an individual case.